EPCOR Flood Mitigation
Updated December 2020. Visit https://www.epcor.com/steinhauerandermineskin for more information
Please note a message from EPCOR: The section that heads east from the Steinhauer dry pond is not expected to impact the toboggan hill. The design shows that the construction boundaries should be to the south of the toboggan hill area. The work in this area will be a combination of directional drilling and open trench excavation. The red construction area lines shown on the map are for illustrative purposes only to give residents an idea of the general work area. An effort will be made to not impede the toboggan hill with the construction.